郭绪华. 煤矿复杂地质条件下过断层技术[J]. 煤矿安全, 2013, 44(5): 89-91.
    引用本文: 郭绪华. 煤矿复杂地质条件下过断层技术[J]. 煤矿安全, 2013, 44(5): 89-91.
    GUO Xu-hua. Crossing Fault Technology of Coal Mine in Complicated Geological Conditions[J]. Safety in Coal Mines, 2013, 44(5): 89-91.
    Citation: GUO Xu-hua. Crossing Fault Technology of Coal Mine in Complicated Geological Conditions[J]. Safety in Coal Mines, 2013, 44(5): 89-91.

    煤矿复杂地质条件下过断层技术

    Crossing Fault Technology of Coal Mine in Complicated Geological Conditions

    • 摘要: 裴沟煤矿过浮山寨断层是一项复杂的系统工程。在分析过断层区域地质构造及水文地质条件的基础上,采取地面与井下相结合、物探与钻探相结合、堵断层带和堵源相结合,探明断层发育情况和水文地质特征,超前预注浆对断层带和顶、底板含水层进行加固,保证了42下山安全穿过浮山寨断层。

       

      Abstract: Crossing Fushanzhai fault is a complicated system engineering for Peigou Coal Mine. On the basis of analyzing geological structure and hydrogeological conditions of crossing fault region, combined the ground and underground, geophysical exploration and drilling, plugging fault zone and plugging source, fault development and hydrogeology features are explored. Using pre-grouting reinforcement to strengthen the fault zone, the roof and floor aquifer, it ensures 42 diphead to safely cross Fushanzhai fault.

       

    /

    返回文章
    返回