田鹏, 康立勋, 张百胜, 郝兵元. 工作面初采预裂爆破深度分析[J]. 煤矿安全, 2013, 44(7): 205-207.
    引用本文: 田鹏, 康立勋, 张百胜, 郝兵元. 工作面初采预裂爆破深度分析[J]. 煤矿安全, 2013, 44(7): 205-207.
    TIAN Peng, KANG Li-xun, ZHANG Bai-sheng, HAO Bing-yuan. Working Face Pre-splitting Blasting Depth Analysis During Primary Mining[J]. Safety in Coal Mines, 2013, 44(7): 205-207.
    Citation: TIAN Peng, KANG Li-xun, ZHANG Bai-sheng, HAO Bing-yuan. Working Face Pre-splitting Blasting Depth Analysis During Primary Mining[J]. Safety in Coal Mines, 2013, 44(7): 205-207.

    工作面初采预裂爆破深度分析

    Working Face Pre-splitting Blasting Depth Analysis During Primary Mining

    • 摘要: 在煤矿的开采过程中,工作面初采顶板悬顶面积较大的问题一直制约着回采的顺利进行,通过常规经验方法并结合关键层的理论知识分析了深孔爆破的炮孔深度,为深孔爆破提供理论依据。

       

      Abstract: In the process of coal mining, the larger roof suspension at working face has always restricted the smooth progress of the stoping during the primary mining, so it has important significance to carry out deep-hole pre-splitting blasting. Based on the conventional empirical methods and combined with the key layer theoretical knowledge, the paper analyzes the deep hole blasting's hole depth, which provides a theoretical basis for the deep hole blasting.

       

    /

    返回文章
    返回