王春光. 八连城煤矿19#煤层瓦斯综合治理方案[J]. 煤矿安全, 2013, 44(8): 129-131.
    引用本文: 王春光. 八连城煤矿19#煤层瓦斯综合治理方案[J]. 煤矿安全, 2013, 44(8): 129-131.
    WANG Chun-guang. Gas Comprehensive Treatment Scheme for 19# Coal Seam in Baliancheng Coal Mine[J]. Safety in Coal Mines, 2013, 44(8): 129-131.
    Citation: WANG Chun-guang. Gas Comprehensive Treatment Scheme for 19# Coal Seam in Baliancheng Coal Mine[J]. Safety in Coal Mines, 2013, 44(8): 129-131.

    八连城煤矿19#煤层瓦斯综合治理方案

    Gas Comprehensive Treatment Scheme for 19# Coal Seam in Baliancheng Coal Mine

    • 摘要: 根据八连城煤层地质和瓦斯赋存情况,结合19#煤层已开采工作面瓦斯涌出情况,提出了内错高位瓦斯巷、高位钻孔、仰角钻孔抽放采空区瓦斯的综合治理方案,并进行了效果检验。

       

      Abstract: According to the coal seam geology and gas occurrence in Baliancheng Coal Mine, combined with gas emission situation in 19# coal seam mining working face, the paper proposed the comprehensive treatment scheme including internal misaligned high gas lane, high level borehole, and using elevation drilling to drainage goaf gas. Finally, the effect is verified.

       

    /

    返回文章
    返回