毛冬阳. 丁5.6-19150工作面沿空掘巷合理煤柱宽度确定[J]. 煤矿安全, 2012, 43(3): 158-160.
    引用本文: 毛冬阳. 丁5.6-19150工作面沿空掘巷合理煤柱宽度确定[J]. 煤矿安全, 2012, 43(3): 158-160.
    MAO Dong-yang. Determination on Rational Coal Pillar Width in Gob-side Entry Driving of Ding5.6-19150 Working Face[J]. Safety in Coal Mines, 2012, 43(3): 158-160.
    Citation: MAO Dong-yang. Determination on Rational Coal Pillar Width in Gob-side Entry Driving of Ding5.6-19150 Working Face[J]. Safety in Coal Mines, 2012, 43(3): 158-160.

    5.6-19150工作面沿空掘巷合理煤柱宽度确定

    Determination on Rational Coal Pillar Width in Gob-side Entry Driving of Ding5.6-19150 Working Face

    • 摘要: 为了最大程度的回收煤炭资源,研究决定在丁5.6-19150工作面风巷试验沿空掘进方式。根据实际地质条件和实测的煤岩层力学参数,按照沿空掘巷窄煤柱宽度设计原则,通过理论计算和数值模拟等研究手段,确定合理煤柱宽度为4 m。现场矿压观测结果表明,丁5.6-19150工作面沿空掘进巷道围岩变形能够满足实际生产需要,煤柱宽度设计合理。

       

      Abstract: In order to reclaim coal resource maximally,the way of gob-side entry driving was tested in Ding5.6-19150 working face.According to the actual geological conditions and the measured mechanical parameters of rock and coal mass,in accordance with the design principles of coal pillar width in gob-side entry driving,the paper determines that the rational coal pillar width is 4 meters by the studying means of theoretical calculation and numerical simulation.The result of mine pressure observation shows that the deformation of the surrounding rock in gob-side entry driving of Ding5.6-19150 working face can meet actual production needs,and the design of coal pillar width is reasonable.

       

    /

    返回文章
    返回