李海洪, 王大伟, 范征. 变频器引起井下漏电保护系统误动的解决方案[J]. 煤矿安全, 2014, 45(9): 120-122.
    引用本文: 李海洪, 王大伟, 范征. 变频器引起井下漏电保护系统误动的解决方案[J]. 煤矿安全, 2014, 45(9): 120-122.
    LI Haihong, WANG Dawei, FAN Zheng. Solution for Error Power-off of Underground Leakage Protection System Caused by Mine-used Frequency Converter[J]. Safety in Coal Mines, 2014, 45(9): 120-122.
    Citation: LI Haihong, WANG Dawei, FAN Zheng. Solution for Error Power-off of Underground Leakage Protection System Caused by Mine-used Frequency Converter[J]. Safety in Coal Mines, 2014, 45(9): 120-122.

    变频器引起井下漏电保护系统误动的解决方案

    Solution for Error Power-off of Underground Leakage Protection System Caused by Mine-used Frequency Converter

    • 摘要: 针对煤矿引入变频器之后,其正常工作时所产生的干扰引起煤矿漏电保护系统误断电的现象,分析了变频器的结构和工作原理,及其干扰煤矿漏电保护系统的具体原因;结合煤矿实际情况,提出了2种相应的解决方案,2种方案各有侧重,可根据具体情况进行选择,采用了MATLAB仿真分析的方法,验证了方案的可行性,解决了变频器所产生的干扰对煤矿漏电保护系统的影响。

       

      Abstract: In view of phenomenon of error power-off of leakage protection system caused by interference produced by frequency converter in coal mine, the article analyzed the structure and working principle of frequency converter, and the specific reason of interference in leakage protection system. According the actual situation in coal mine, the article introduced two solutions. These two solutions have different emphasis and can be chosen according to specific conditions. The feasibility of these two schemes has been verified through the method of MATLAB simulation analysis, and the impact of error power-off of leakage protection system for mine caused by interference produced by frequency converter has been solved.

       

    /

    返回文章
    返回