杨勇, 孙前芳. 高头窑煤矿2-3煤层“两带”高度观测及水体下安全开采技术[J]. 煤矿安全, 2015, 46(12): 73-76.
    引用本文: 杨勇, 孙前芳. 高头窑煤矿2-3煤层“两带”高度观测及水体下安全开采技术[J]. 煤矿安全, 2015, 46(12): 73-76.
    YANG Yong, SUN Qianfang. Two-band Height Observation of Gaotouyao Coal Mine 2-3 Coal Seam and Safety Mining Under Water[J]. Safety in Coal Mines, 2015, 46(12): 73-76.
    Citation: YANG Yong, SUN Qianfang. Two-band Height Observation of Gaotouyao Coal Mine 2-3 Coal Seam and Safety Mining Under Water[J]. Safety in Coal Mines, 2015, 46(12): 73-76.

    高头窑煤矿2-3煤层“两带”高度观测及水体下安全开采技术

    Two-band Height Observation of Gaotouyao Coal Mine 2-3 Coal Seam and Safety Mining Under Water

    • 摘要: 由于高头窑煤矿井田内水系较多且较发育,一旦在开采过程中工作面与地表水沟通,将会发生重大安全事故。为防止煤矿发生透水事故,采用经验公式法、类比法及数值模拟法,合理确定了防水安全煤岩柱尺寸。目前水多湖川下首个回采工作面正在安全开采,证明合理的煤岩柱留设及限厚开采达到了预期效果。

       

      Abstract: Due to the more developed water system in Gaotouyao Coal Mine, once the coal mining face is connected with the surface water in the process of mining, it will cause major safety accidents. In order to prevent the coal mine flooding accidents, with the help of the experience formula method, analogy method and numerical simulation method, we determine the reasonable size of waterproof coal and rock pillar. At present, the first mining face under water is safe, which proves that the reasonable coal rock pillar setting and limit mining thickness can achieve the desired effect.

       

    /

    返回文章
    返回