李府泉, 王晓. 副斜井双钩提升设计方案[J]. 煤矿安全, 2016, 47(8): 129-132.
    引用本文: 李府泉, 王晓. 副斜井双钩提升设计方案[J]. 煤矿安全, 2016, 47(8): 129-132.
    LI Fuquan, WANG Xiao. Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft[J]. Safety in Coal Mines, 2016, 47(8): 129-132.
    Citation: LI Fuquan, WANG Xiao. Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft[J]. Safety in Coal Mines, 2016, 47(8): 129-132.

    副斜井双钩提升设计方案

    Design Scheme of Double Hook Hoisting in Auxiliary Inclined Shaft

    • 摘要: 以芦村二号煤矿副斜井井筒双钩提升为例,来研究影响副斜井井筒设计中的各种因素,并通过其影响因素间的相互关系,来确定出乘人车场和存车场的位置、井筒内轨道的布置形式等副斜井井筒设计中的重要参数,为双钩提升的副斜井井筒设计提供了完整的设计思路和理念。

       

      Abstract: Taking double hook hoisting in auxiliary inclined shaft of Lucun No.2 Coal Mine as an example, we study various factors impacting auxiliary inclined shaft design, and determine the important parameters of auxiliary inclined shaft such as the position of mancar yard, storage yard, the track arrangement form of shaft through the relationship of influencing factors, which provides the integrated design thought and conception for double hook hoisting in auxiliary inclined shaft.

       

    /