陈毓. 基于Minex的矿山储量计算[J]. 煤矿安全, 2012, 43(8): 171-173.
    引用本文: 陈毓. 基于Minex的矿山储量计算[J]. 煤矿安全, 2012, 43(8): 171-173.
    CHEN Yu. Mine Reserves Calculation Based on Minex[J]. Safety in Coal Mines, 2012, 43(8): 171-173.
    Citation: CHEN Yu. Mine Reserves Calculation Based on Minex[J]. Safety in Coal Mines, 2012, 43(8): 171-173.

    基于Minex的矿山储量计算

    Mine Reserves Calculation Based on Minex

    • 摘要: 煤岩量的计算是露天矿编制矿山工程进度计划的重要依据,是采矿设计中最主要的工作。利用Minex 6.0软件,以新疆后峡煤田黑山露天煤矿为例,建立了首采区的采场模型,确定各个工程位置的煤岩量并绘制V-P曲线,为采矿设计人员编制开采进度计划及开采工艺和设备的选择提供了重要的依据,大大提高了采矿设计人员的工作效率。

       

      Abstract: The calculation of the coal and rock amount is an important basis for compiling mine engineering schedule plan of the open pit,which is the most important work in mining design.Taking Heishan open pit of Xinjiang Houxia coalfield as an example,this paper established the stope model of the first mining area,determined the coal and rock amount in various engineering positions and drew the V-P curve by using Minex 6.0 software,which provided an important basis for mining designers to compile the mining schedule plan and select equipment and mining technology.

       

    /

    返回文章
    返回