吴东领, 安艳辉. 基于数据库的矿井地层冻结一线总线监测技术[J]. 煤矿安全, 2017, 48(12): 111-112.
    引用本文: 吴东领, 安艳辉. 基于数据库的矿井地层冻结一线总线监测技术[J]. 煤矿安全, 2017, 48(12): 111-112.
    WU Dongling, AN Yanhui. Monitoring Technology of Front-line Bus for Mine Formation Freezing Based on Database[J]. Safety in Coal Mines, 2017, 48(12): 111-112.
    Citation: WU Dongling, AN Yanhui. Monitoring Technology of Front-line Bus for Mine Formation Freezing Based on Database[J]. Safety in Coal Mines, 2017, 48(12): 111-112.

    基于数据库的矿井地层冻结一线总线监测技术

    Monitoring Technology of Front-line Bus for Mine Formation Freezing Based on Database

    • 摘要: 冻结壁并不能够直接可视的观察到,需要借助有效的监测系统来进行监测。针对矿井地层冻结监测中测点多、距离长等相关难题,提出了应用一线总线式的技术开发的矿井地层冻结一线总线监测系统软件方案,并对这一系统进行了详细介绍。实践证明这一系统具备较高的可靠性、稳定性、实用性。

       

      Abstract: The observation of frozen wall can not be observed directly, and it needs to be monitored by an effective monitoring system. In view of the mine freezing point, long distance and other related problems of monitoring, in this paper, the software scheme of the first-line bus monitoring system for mine formation freezing using the first-line bus type development technology is proposed, and the system is introduced in detail. The system has been proved to be of high reliability, stability and practicability.

       

    /

    返回文章
    返回