李日富. 煤矿采动稳定区煤层气资源量“间接扣减”评估方法及其应用[J]. 煤矿安全, 2018, 49(4): 160-164.
    引用本文: 李日富. 煤矿采动稳定区煤层气资源量“间接扣减”评估方法及其应用[J]. 煤矿安全, 2018, 49(4): 160-164.
    LI Rifu. "Indirect Deduction” Assessment Method and Application for CBM Resources in Coal Mining Stability Area[J]. Safety in Coal Mines, 2018, 49(4): 160-164.
    Citation: LI Rifu. "Indirect Deduction” Assessment Method and Application for CBM Resources in Coal Mining Stability Area[J]. Safety in Coal Mines, 2018, 49(4): 160-164.

    煤矿采动稳定区煤层气资源量“间接扣减”评估方法及其应用

    "Indirect Deduction” Assessment Method and Application for CBM Resources in Coal Mining Stability Area

    • 摘要: 基于物质平衡理论,在构建采动稳定区各原始资源气量及损失气量估算模型的基础上提出煤层气资源量“间接扣减”评估方法。运用该方法对晋城成庄矿5310工作面采动稳定区瓦斯资源量进行了估算,现场抽采试验表明:整个工作面的预计核算抽采气量与测算结果基本一致,验证了评估方法的准确性;采动稳定区地面井在运行正常后即会达到产气高峰期,在稳定产气一段时间后进入衰减阶段,其抽采气量曲线整体呈现出“平-降”的特点。

       

      Abstract: Based on the theory of material balance, an evaluation method of “indirect deduction” for CBM resources in coal mining stability area is proposed on the basis of the estimation model of original gas resources and loss gas volume. The method was then applied to the estimation of gas resources in the mining stable area of the 5310 working face in the Chengzhuang Mine of Jincheng Coal Group. The field drainage test shows that the estimated gas output of the whole face is basically consistent with the evaluation results, which proves the evaluation method is accurate. Besides, the surface well can immediately step into the gas production peak period after the commissioning period, and it will enter the attenuation stage after a period of stable gas production, and the gas extraction curve shows the characteristics of “flat-down” in general.

       

    /

    返回文章
    返回