王绪友. 易燃厚煤层综放工作面支架撤除期间全风压通风技术[J]. 煤矿安全, 2012, 43(9): 72-74.
    引用本文: 王绪友. 易燃厚煤层综放工作面支架撤除期间全风压通风技术[J]. 煤矿安全, 2012, 43(9): 72-74.
    WANG Xu-you. Full Air Pressure Ventilation Technology on Fully Mechanized Caving Face of Inflammable Thick Seam During Stent Removal Period[J]. Safety in Coal Mines, 2012, 43(9): 72-74.
    Citation: WANG Xu-you. Full Air Pressure Ventilation Technology on Fully Mechanized Caving Face of Inflammable Thick Seam During Stent Removal Period[J]. Safety in Coal Mines, 2012, 43(9): 72-74.

    易燃厚煤层综放工作面支架撤除期间全风压通风技术

    Full Air Pressure Ventilation Technology on Fully Mechanized Caving Face of Inflammable Thick Seam During Stent Removal Period

    • 摘要: 易燃厚煤层综放工作面回撤期间,在对工作面进行防火预处理的前提下,利用通风道的留设、回风侧通风设施的调控,采取全风压通风技术,确保了工作面的安全回撤。

       

      Abstract: During withdrawing period of inflammable thick seam fully mechanized caving face,under the premise of fire pretreatment on the working face,using the setting of air duct and regulating of the return air side ventilation device,full air pressure ventilation technology was utilized,which ensured the safety retracement of working face.

       

    /