刘广超. 大断裂构造井上下联合注浆加固技术[J]. 煤矿安全, 2018, 49(10): 163-167.
    引用本文: 刘广超. 大断裂构造井上下联合注浆加固技术[J]. 煤矿安全, 2018, 49(10): 163-167.
    LIU Guangchao. Up-and-down Joint Grouting Reinforcement Technology for Large Faulted Structure[J]. Safety in Coal Mines, 2018, 49(10): 163-167.
    Citation: LIU Guangchao. Up-and-down Joint Grouting Reinforcement Technology for Large Faulted Structure[J]. Safety in Coal Mines, 2018, 49(10): 163-167.

    大断裂构造井上下联合注浆加固技术

    Up-and-down Joint Grouting Reinforcement Technology for Large Faulted Structure

    • 摘要: 针对九里山马坊泉大断层上下盘岩层极为破碎、裂隙极为发育,二水平3条暗斜井在开拓中存在极大突水风险的现状,结合矿井实际情况,通过井下探测钻孔确定断层准确位置,并在此基础上,先在井下使用高水双液速凝堵水材料加固断层破碎带、切断断层导水通道、封堵突水点,然后在地面使用水泥黏土材料大范围注浆,截断冲积层含水层涌水通道及深部L2、O2灰岩含水层向上的补给通道。结果表明:巷道涌水量降低至0.7 m3/min,有效的降低了巷道涌水量;含水层水压由2.8 MPa降至1.2 MPa以下,水位下降40 m左右。实现了九里山矿井巷工程穿过大断裂构造过程中“零突水、零淹面、零影响”的水害治理目标。

       

      Abstract: In view of the fact that the upper and lower footwall strata of Jiulishan Mafangquan fault are extremely broken and the fractures are extremely developed, there is a great risk of water inrush in the development of the two horizontal three sub-inclined shafts. According to the actual situation of the mine, the accurate location of the fault can be determined by underground detection and drilling. On this basis, the high water double-fluid quick coagulation plugging material was used to strengthen the fault fracture zone, cut off the water channel of the fault, and block the water inrush point in the underground, and then the cement clay material was used for grouting in a large area on the ground to cut off the water inrush channel of the aquifer in the alluvial layer and the uplift supply channel of the deep L2 and O2 limestone aquifers. The results show that the roadway inflow decreased to 0.7 m3/min, which effectively reduced the water inflow of roadway; the water pressure of the aquifer dropped from 2.8 MPa to below 1.2 MPa, and the water level dropped by about 40 m. The water pollution control goal of “zero water inrush, zero flooding surface and zero influence” in the project of Jiulishan Mine roadway through the large fault structure is realized.

       

    /