蔡茂义, 王平. 基建矿井主要通风机叶片角度调整实践[J]. 煤矿安全, 2012, 43(11): 128-129.
    引用本文: 蔡茂义, 王平. 基建矿井主要通风机叶片角度调整实践[J]. 煤矿安全, 2012, 43(11): 128-129.
    CAI Mao-yi, WANG Ping. Practice of Blade Angle Adjustment of Infrastructure Mine Main Fan[J]. Safety in Coal Mines, 2012, 43(11): 128-129.
    Citation: CAI Mao-yi, WANG Ping. Practice of Blade Angle Adjustment of Infrastructure Mine Main Fan[J]. Safety in Coal Mines, 2012, 43(11): 128-129.

    基建矿井主要通风机叶片角度调整实践

    Practice of Blade Angle Adjustment of Infrastructure Mine Main Fan

    • 摘要: 矿井在基建期间以及投产初期普遍存在通风能力富余、浪费电力资源的问题,结合贵州兴隆煤矿的生产实践,说明采取进一步调整通风机主要通风机叶片角度的措施,既能满足矿井基建期间以及投产初期的通风需要,同时有效地降低电力消耗,提高矿井的经济效益。

       

      Abstract: The problem always happen,which is coal mine ventilation ability surplus and power resources waste during the early production and construction.According to the production practice of Xinglong coal mine,the paper testifies that the measures which are adjusting the ventilation fan blade angle turnover,not only can fulfil ventilation need during the early production and construction,but also can reduce power consumption and improve the economic benefits of mine.

       

    /

    返回文章
    返回