曹始友, 董方营, 陈大林, 张历峰, 徐德宝, 王松, 王鹏, 尹会永, 郑永杰. 滕州矿区3#煤综放开采顶板导水断裂带高度预测模型[J]. 煤矿安全, 2022, 53(3): 236-242.
    引用本文: 曹始友, 董方营, 陈大林, 张历峰, 徐德宝, 王松, 王鹏, 尹会永, 郑永杰. 滕州矿区3#煤综放开采顶板导水断裂带高度预测模型[J]. 煤矿安全, 2022, 53(3): 236-242.
    CAO Shiyou, DONG Fangying, CHEN Dalin, ZHANG Lifeng, XU Debao, WANG Song, WANG Peng, YIN Huiyong, ZHENG Yongjie. A prediction model for height of water-conducting fracture zone in fully mechanized caving of 3# coal seam in Tengzhou Mining Area[J]. Safety in Coal Mines, 2022, 53(3): 236-242.
    Citation: CAO Shiyou, DONG Fangying, CHEN Dalin, ZHANG Lifeng, XU Debao, WANG Song, WANG Peng, YIN Huiyong, ZHENG Yongjie. A prediction model for height of water-conducting fracture zone in fully mechanized caving of 3# coal seam in Tengzhou Mining Area[J]. Safety in Coal Mines, 2022, 53(3): 236-242.

    滕州矿区3#煤综放开采顶板导水断裂带高度预测模型

    A prediction model for height of water-conducting fracture zone in fully mechanized caving of 3# coal seam in Tengzhou Mining Area

    • 摘要: 为精确预测滕州矿区山西组3#煤综放开采顶板导水断裂带发育高度,以滕州矿区18个采煤工作面导水断裂带高度和各主控因素实测数据为基础,运用SPSS软件对采厚、采深、煤层倾角、走向长度、倾向长度、顶板厚度6个因素进行相关性分析,并构建了导水断裂带高度多元线性回归预测模型;以藤县煤田4个工作面为例,分别采用“三下规范”公式、中国矿业大学(北京)总结经验公式和回归模型对导水断裂带高度进行计算并进行误差分析对比;借助UDEC数值模拟分析进行辅助验证。结果表明:本模型预测值与实测值更接近,较经验公式计算结果精度更高,误差基本控制在8%以内,提高了预测精度。

       

      Abstract: In order to accurately predict the development height of water-conducting fracture zone in the roof of fully mechanized caving coal of No.3 coal seam in Tengzhou Mining Area, based on the measured data of water-conducting fracture zone height and main control factors of 18 working faces in Tengzhou Mining Area, we use SPSS software to carry out correlation analysis on six factors such as mining thickness, mining depth, coal seam dip angle, strike length, dip length and roof thickness, and build the water-conducting fractured zone height of multivariate linear regression forecast model. Finally, four working faces in TengxianCoalfield are taken as examples to calculate the height of water-conducting fracture zone and compare the error analysis by using the regulations for coal mining under buildings, water bodies and railways, standard formula and regression model. In addition, Tengdong Coal Mine also used UDEC numerical simulation analysis for auxiliary verification. The results show that the model’s predicted values in this paper are closer to the measured values(the error is controlled within 8%), and the accuracy is higher than that of the empirical formula.

       

    /