column
    Research on Strata Behavior Laws of “Hilt-shape” Fully Mechanized Working Face with 7 m Large Mining Height
    HOU Zhicheng
    2017, 48(s1): 1-4.
    Abstract
    Study on Critical Layer Movement Laws of Large Mining Height Fully Mechanized Working Face in Shendong Mining Area
    LIU Yingjie
    2017, 48(s1): 5-9.
    Abstract
    Measurement Analysis and Simulation Study on Advanced Ground Pressure Laws of Two Roadways at 22303 Working Face in Bulianta Coal Mine
    QI Jie, LIU Bingliang
    2017, 48(s1): 10-14.
    Abstract
    Long Pressure Short Drainage Dust Removal by Ventilation Technology in Shendong Mining Area Tunneling Roadway
    GUO Yongwen
    2017, 48(s1): 15-19.
    Abstract
    Dynamic Load Ground Pressure Control Technology for Bulianta Coal Mine 7 Meters Large Mining Height Fully Mechanized Coal Face Passing Through Stress-concentrated Coal Pillar
    CHI Guoming, QI Hao
    2017, 48(s1): 20-23,31.
    Abstract
    Strata Behaviors Laws of End-mining and Withdrawing of Fully Mechanized Coal Mining Face and Roof Control Technology
    HAN Long
    2017, 48(s1): 24-27,28.
    Abstract
    Laying Asphalt Pavement at Large Dip Angle and Long Distance Inclined Shaft by Coal Mine TBM Method
    TANG Haijun
    2017, 48(s1): 28-31.
    Abstract
    Spontaneous Combustion Control Technology in Overlying Goaf of Bulianta Coal Mine
    GUAN Wanli
    2017, 48(s1): 32-36,42.
    Abstract
    Study and Application of New Channel Support and Pressure Relief Cut-through Technology for Fully Mechanized Working Face in Shendong Mining Area
    YAO Hai
    2017, 48(s1): 37-42.
    Abstract
    Prevention and Control Technique for Confined Water of Floor Sandstone at 42201 Working Face of Buertai Coal Mine
    GAO Zhenyu, HE Yuan, REN Jiangang, LIU Xiaoxiong
    2017, 48(s1): 43-47.
    Abstract
    Co-rotating Pneumatic-type Automatic Door of Bulianta Coal Mine
    ZHANG Lihui, ZHANG Yunzeng
    2017, 48(s1): 48-51,55.
    Abstract
    A Kind of Constant Deceleration Braking System for Hoister
    ZHAO Yadong, YIN Qiang
    2017, 48(s1): 52-55.
    Abstract
    Application of Fiber-optic Gyroscope in Fast Driving System in Daliuta Mine
    LUO Wen, YANG Xinlin, HUANG Dong, SHI Shendong, ZHANG Xiaori
    2017, 48(s1): 56-58,62.
    Abstract
    Application of JSG4 Infrared Beam Tube Monitoring System in Shendong Mining Area
    JI Ping
    2017, 48(s1): 59-62.
    Abstract
    Application of High Pressure Water Pre-splitting Forced Caving Technology in Shendong Mining Area
    YANG Juncai
    2017, 48(s1): 63-68.
    Abstract
    Safety Technology and Emergency Disposal Measures for Pressure Balancing Ventilation at 22307 Working Face of Bulianta Coal Mine
    QIN Qinghe, ZHANG Lihui
    2017, 48(s1): 69-71,75.
    Abstract
    Construction of Divisional Drainage System for Ten-million-ton Mine
    PANG Naiyong
    2017, 48(s1): 72-75.
    Abstract
    Application of High Strength Polyester Flexible Net in End-mining Holing-through of Shallow Buried Depth of 5.0 m Fully Mechanized Coal Face
    LIU Jianyu, LIU Yinbao
    2017, 48(s1): 76-79.
    Abstract
    Application of Three-dimensional Seismic Exploration in Prediction of Coal Seam Thickness
    LI Wei, LI Jiliang
    2017, 48(s1): 80-85.
    Abstract
    Study on Coal Mine Hydro-geological Classification Standards in Shendong Mining Area
    WANG Zhenrong
    2017, 48(s1): 86-89.
    Abstract
    Study on Geological Environment Reconstruction of Drought Glassland Region in Bulianta Coal Mine
    LIU Zhaoxiang
    2017, 48(s1): 90-93,98.
    Abstract
    Low Oxygen Prevention and Control for Shallow-buried Depth and Large Area Goaf at Fully Mechanized Working Face Based on Pressure Balance Ventilation Technique
    LI Bin, YANG Yingbing
    2017, 48(s1): 94-98.
    Abstract
    Risk Assessment and Control Measures for Ordovician Limestone Water Inrush in Baode Mine
    KANG Jian
    2017, 48(s1): 99-103,108.
    Abstract
    Research and Exploitation of Resource Development and Utilization of Shendong Mining Area
    WANG Shuyan
    2017, 48(s1): 104-108.
    Abstract
    Measures for Safety Management of Coal Mine Under New Normal State
    WANG Cunfei, FAN Wensheng
    2017, 48(s1): 109-112.
    Abstract
    "One Ventilation and Three Prevention"Major Disaster Prevention and Control Technology and Experience of Shendong Company
    ZHANG Yongfu
    2017, 48(s1): 113-116,121.
    Abstract
    Application of Production Management System in Shendong Mining Area
    MA Yadong
    2017, 48(s1): 117-121.
    Abstract
    Application of Coal Mine Post Standard Operation Procedure in Lean and Risk Pre-control Management System
    GAO Dengyun, LIU Yingjie
    2017, 48(s1): 122-127.
    Abstract
    Safety Protection Emphasis and Countermeasures of TBM Method in Inclined Shaft Construction of Coal Mine
    LIU Jie
    2017, 48(s1): 128-132.
    Abstract

    Hot Articles

    More+

      Speical Issues

      More+