WANG Zhao-feng, LI Jie, YANG Hong-min, PENG Xing. A Re-treatment Measure on Failing Hole Sealing of Gas Drill Hole[J]. Safety in Coal Mines, 2012, 43(5): 86-88.
    Citation: WANG Zhao-feng, LI Jie, YANG Hong-min, PENG Xing. A Re-treatment Measure on Failing Hole Sealing of Gas Drill Hole[J]. Safety in Coal Mines, 2012, 43(5): 86-88.

    A Re-treatment Measure on Failing Hole Sealing of Gas Drill Hole

    • Aimed at the problem of useless hole sealing which caused low drainage consistence and low efficiency,in gas suction system of Jiulishan coal,on the base of original second hole sealing measures(inside sealing method),a three steps re-treatment measure(broken hole sealing method)was put forward which is "destroy hole、drill hole、subsection sealing ".Through the experiment of drainage hole in 14121 transport tunnel of Jiulishan coal,and compared with the inside sealing method measure,a result was proved that this method dealing with average drainage consistence is 2.52 times to the inside sealing method.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return