    • 摘要: 针对预筑混凝土墙沿空掘巷巷旁墙体宽度的确定问题,以金星煤业3号煤层为研究背景,采用理论计算确定巷旁墙体的宽度范围,结合数值模拟对该范围内不同宽度的墙体在工作面开采过程中的应力分布及变形特征进行研究。结果表明:确定巷旁墙体宽度范围为0.43~2.41 m;不同宽度的墙体应力分布和变形特征数值上有所不同,但在工作面开采过程中,其动态变化特征大致相同;随着工作面的推进,墙体的应力和变形增长幅度呈先增大后稳定的趋势,其中在超前工作面40 m至滞后工作面40 m变化幅度较大,在滞后工作面40 m后变化幅度趋于平稳;随着墙体宽度的增加,墙体的应力及变形呈现减小的趋势,且在墙体宽度1.2~2.0 m时,变化趋势明显减弱;结合经济效益因素,确定墙体宽度为1.2 m。

       

      Abstract: Aiming at the problem of determining the wall width of gob-side entry driving by the pre-built concrete wall, taking No.3 coal seam of Jinxing Coal Industry as the research background, the width range of the side wall is determined by theoretical calculation. Combined with numerical simulation, the stress distribution and deformation characteristics of the wall with different widths in the range are studied during the mining process of the working face. The width of the side wall is determined to be in the range of 0.43-2.41 m; the stress distribution and deformation characteristics of the wall with different widths are different numerically, but the dynamic change characteristics are roughly the same during the mining process of the working face; with the advance of the working face, the increase amplitude of the stress and deformation of the wall increases first and then becomes stable. Among them, the variation range is relatively large from 40 m ahead of the working face to 40 m behind the working face, and the variation range tends to be stable after 40 m behind the working face. With the increase of the wall width, the stress and deformation of the wall show a decreasing trend, and the change trend is significantly weakened when the wall width is 1.2-2.0 m. Combined with economic benefit factors, the wall width is determined to be 1.2 m.

       

    /

    返回文章
    返回