巷道大变形围岩柔性锚索支护技术研究

    Research on flexible anchor cable support technology for large deformation surrounding rock in roadway

    • 摘要: 为解决深井围岩“强支、密支”条件下依旧会产生大变形的问题,通过理论分析和数值模拟研究了支护阻力对围岩应力、变形的影响,提出了大变形柔性锚索支护技术并进行了现场应用。研究结果表明:锚索锚固形成的组合梁能降低岩层挠度与岩石中的应力;巷道顶板不同区域的锚索受力存在差异性,位于巷道顶板中部的锚索受到拉力产生的轴力大于位于巷道顶板帮部的锚索受到拉力产生的轴力;增大支护阻力能够减小巷道顶板浅部围岩拉应力区的面积,改善巷道顶板围岩的应力状态,增加巷道顶板的稳定性,但当锚索数量增加到一定程度时,巷道围岩变形量不再明显减少,控制效果有限,支护阻力的增加不会明显降低每根锚索的受力;在保证支护阻力的基础上,锚索仍须具有主动适应围岩持续变形的能力,避免在巷道服务期间发生破断;大变形柔性锚索能承受较大的冲击能量,延伸率超10%。工程实践结果表明:采用大变形柔性锚索进行巷道顶板支护,掘进期间巷道顶底板移近量最大为145.9 mm,90 d后变形速率稳定,回采期间工作面前方30 m内变形剧烈,监测点距工作面3 m时顶底板移近量为332.7 mm,整个服务周期内顶底板围岩总变形量约为478.4 mm,大变形柔性锚索自由段最大延伸量约为550 mm,不会由于达到延伸极限而破断,满足安全使用要求,实现了对巷道顶板的稳定性控制。

       

      Abstract: In order to solve the problem of large deformation under the condition of “strong support and dense support” of the surrounding rock of deep wells, the influence of the support resistance on the stress and deformation of the surrounding rock was studied through theoretical analysis and numerical simulation, and the large deformation flexible anchor cable support technology was proposed for field application. The results of the study show that the combined beam formed by anchor cable anchoring reduces the deflection of rock strata and the stress in rocks; there are differences in the force on the anchor cables in different areas of the roadway roof, and the axial force generated by the tension on the anchor cables located in the middle of the roadway roof is greater than the axial force generated by the tension on the anchor cables located in the side section of the roadway roof; increasing the support resistance can reduce the area of the tensile stress zone of the shallow surrounding rock of the roadway roof, improve the stress state of the surrounding rock of the roadway roof, and increase the stability of the roadway roof, but when the number of anchor cables is increased to a certain degree, the deformation of the roadway surrounding rock is no longer significantly reduced, and the control effect is limited, and the increase of the support resistance will not significantly reduce the force of each anchor cable; on the basis of ensuring the support resistance, the anchor cable still needs to have the ability to actively adapt to the continuous deformation of the surrounding rock to avoid breakage during the service period of the roadway; large deformation flexible anchor cable can withstand large impact energy, elongation rate of more than 10%. The results of engineering practice show that the roof support of the roadway was carried out by using large-deformation flexible anchor cables, during the tunneling period, the maximum approach of the roof and floor of the roadway was 145.9 mm, and the deformation rate was stable after 90 days; during the mining period, the deformation was intense within 30 meters in front of the working face; when the monitoring point was 3 meters away from the working face, the approach of the roof and floor was 332.7 mm; during the entire service cycle, the total deformation of the surrounding rock of the roof and floor is approximately 478.4 mm; the maximum extension of the free section of the large deformation flexible anchor cable is approximately 550 mm. It will not break due to reaching the extension limit and meets the requirements of safe use and achieves the stability control of the roadway roof.

       

    /

    返回文章
    返回