基于多源数据融合的特厚煤层综放开采覆岩“两带”高度研究

    Research on the height of “two zones” in overlying strata of fully mechanized caving mining of extra-thick coal seam based on multi-source data fusion

    • 摘要: 为防止采煤工作面覆岩导水裂隙带高度发育至含水层导致工作面发生水害事故,对陈家沟煤矿8514工作面特厚煤层综放开采条件下覆岩导水裂隙带和垮落带(合称“两带”)高度进行了深入研究。8514工作面覆盖岩层主要由泥岩、砂质泥岩及粉砂岩组成,地质单元结构较为简单,厚煤层的大采高综放开采而导致上覆岩层受到明显的采动破坏,基于地面钻孔实测、经验公式理论计算、数值模拟(3DEC与FLAC3D)、相似模拟等多源数据融合,综合分析“两带”的发育高度。研究结果表明:实测结果显示,ZK−1孔的导水裂隙带高度为151.71 m,垮落带高度为87.21 m;经验公式理论计算结果显示,导水裂隙带高度为134.21 m,垮落带高度为53.92 m;数值模拟(采用3DEC与FLAC3D方法)分析结果显示,导水裂隙高度为122.6 m,裂采比为10.66;相似模拟分析结果显示,导水裂隙带高度为135.7 m,裂采比为11.8。以安全生产的角度综合多方面结果得出,导水裂隙带高度为151.71 m,裂采比12.24;垮落带高度87.21 m,垮采比7.03。

       

      Abstract: To prevent water inrush accidents in the coal mining face caused by the development of the water-conducting fracture zone in the overlying strata to the aquifer, this study conducts an in-depth study on the height of the water-conducting fracture zone and the caving zone (hereinafter referred to as “two zones”) under the condition of fully mechanized caving mining of the extremely thick coal seam in 8514 working face of Chenjiagou Coal Mine. The overlying strata of 8514 working face are mainly composed of mudstone, sandy mudstone and siltstone, and the geological unit structure is relatively simple. The overlying strata have been significantly affected by mining activities due to the fully mechanized caving mining of the thick coal seam. Based on the integration of multi-source data such as ground drilling measurements, theoretical calculations using empirical formulas, numerical simulations (3DEC and FLAC3D), and similar simulations, the development heights of the collapse zone and the water-conducting fracture zone are comprehensively analyzed. The research shows that: the water-conducting fracture zone height of the ZK-1 borehole is 151.71 m and the height of the collapse zone is 87.21 m; the theoretical calculation results using empirical formulas show that the height of the water-conducting fracture zone is 134.21 m and the height of the caving zone is 53.92 m; the numerical simulation analysis results (using 3DEC and FLAC3D methods) show that the height of the water-conducting fracture is 122.6 m and the fracture-to-mining ratio is 10.66; the similar simulation analysis results show that the height of the water-conducting fracture zone is 135.7 m and the fracture-to-mining ratio is 11.8; from the perspective of safe production, the height of the water-conducting fracture zone is 151.71 m and the fracture-to-mining ratio is 12.24; the height of the collapse zone is 87.21 m and the caving-to-mining ratio is 7.03.

       

    /

    返回文章
    返回