受采动影响巷道交叉点大断面硐室锚注加固支护技术

    Anchor-grouting reinforcement support technology for large-section chambers at roadway intersections under mining disturbance

    • 摘要: 针对巷道交叉点处大断面硐室受强采动影响,围岩持续变形的控制难题,以鹤壁煤电股份有限公司第九煤矿轨道上山上平巷段为工程背景,采用理论分析和现场测试的手段,结合FLAC3D软件,开展了大断面硐室应力分布规律及变形失稳特征研究,分析了未受采动影响及受采动影响时,不同开挖状态下上平巷三心拱断面与大断面硐室的垂直应力分布、位移变化与塑性区破坏特征,以及随工作面推进大断面硐室垂直应力、围岩位移增量与塑性区演化规律。结果表明:巷道断面大及巷道布置集中是大断面硐室在未受开采动压影响下变形破坏的主要原因;巷道所受采掘影响分为无扰动、弱扰动和强扰动3个阶段;强扰动阶段大断面位移量占总位移量的76.4%,左侧垂直应力达到32.37 MPa,是右侧的1.24倍;工作面开采导致顶板下沉量为底板底鼓量的1.88倍,左帮变形量是右帮的2.43倍,且工作面开采产生的塑性区与巷道塑性区贯通,巷道围岩变形破坏范围显著增大,支护难度增大。基于大断面硐室变形破坏原因及规律,提出了锚网索主动支护、注浆支护与被动支护结合的联合支护技术,设计了“半圆拱U36型钢架棚支护+7字形U36型钢架棚支护+注浆锚杆+注浆锚索”联合支护方案,在巷道交叉点大断面硐室得到了成功应用,对于同类型巷道围岩控制具有重要的参考价值。

       

      Abstract: To address the control difficulty of continuous surrounding rock deformation in large-section chambers at roadway intersections under strong mining disturbance, a study on the stress distribution law and deformation-failure characteristics of large-section chambers was carried out by means of theoretical analysis and field testing, combined with FLAC3D software. The engineering background was the upper horizontal roadway of the haulage rise in the No. 9 Coal Mine of Hebi Coal and Electricity Co., Ltd. The vertical stress distribution, displacement variation and plastic zone failure characteristics of the three-centered arch section of the upper horizontal roadway and the large-section chamber under different excavation conditions with and without mining disturbance, the evolution laws of vertical stress, surrounding rock displacement increment and plastic zone of the large-section chamber with the advance of the working face were analyzed. The results show that the large roadway section and concentrated roadway layout are the main causes of deformation and failure of the large-section chamber under the condition of no mining dynamic pressure. The mining influence on the roadway can be divided into three stages: non-disturbance, weak disturbance and strong disturbance. In the strong disturbance stage, the displacement of the large-section chamber accounts for 76.4% of the total displacement, and the vertical stress on the left side reaches 32.37 MPa, which is 1.24 times that on the right side. The roof subsidence caused by working face mining is 1.88 times the floor heave, and the deformation of the left sidewall is 2.43 times that of the right sidewall. In addition, the plastic zone caused by working face mining is connected with that of the roadway, which significantly enlarges the deformation and failure range of surrounding rock and increases the difficulty of support. Based on the causes and laws of deformation and failure of large-section chambers, a combined support technology integrating bolt-mesh-cable active support, grouting support and passive support is proposed. The combined support scheme, namely “semi-circular arch U36 steel support + 7-shaped U36 steel support + grouting bolts + grouting cables”, are designed and successfully applied to the large-section chamber at the roadway intersection. This study provides an important reference for surrounding rock control of similar roadways.

       

    /

    返回文章
    返回