不规则荷载下端帮煤柱稳定性及边坡变形分析

    Stability of end slope pillars and slope deformation under irregular loads

    • 摘要: 为了研究露天煤矿排土场不规则荷载对露天煤矿端帮开采煤柱及边坡稳定性的影响,以内蒙古鄂尔多斯来叶沟露天矿为背景,基于排土场不规则几何形态,优化Mark−Bieniawski公式,结合岩土体物理力学参数,对煤柱及边坡在有无排土场荷载条件下进行数值模拟研究,运用Rhino软件进行三维建模及网格划分,使用FLAC3D从位移变化、塑性区分布情况和边坡滑移进行计算分析。研究结果表明,有排土场时支撑煤柱宽度为2.9 m,隔离煤柱宽度为8.88 m;无排土场时支撑煤柱宽度为2.8 m,隔离煤柱宽度为8.29 m。排土场荷载加剧煤柱变形,掘进至100 m深度时,顶板沉降达7.3 mm,底鼓量为6.98 mm;掘进至150 m深度时,顶板沉降达6.79 mm,底鼓量为7.63 mm。边坡位移在排土场荷载下增至38.2 mm,无荷载时为31.9 mm。排土场荷载影响煤柱的受力与变形,特别是在深度较大的开采过程中,上部不规则荷载导致煤柱产生较大的变形和应力集中,增加了煤柱的不稳定风险。在开采深度较大的区域,荷载使边坡的位移增大,对边坡的稳定性产生了影响,增加了滑坡的风险。端帮覆岩开采后边坡内形成采空区,边坡的塑性区面积发生了急剧增加,以拉伸破坏为主。最大剪应变增量集中于采硐顶板区域,形成“坐落推移式”滑坡风险,在该方案稳定性分析中,边坡安全系数均大于1.5,满足设计规范要求。在存在不规则排土场荷载的端帮开采过程时,应考虑合理的方案,以降低煤柱变形和边坡失稳带来的安全风险。

       

      Abstract: To study the impact of irregular loads from the overburden dumping site on the stability of the coal pillar and slope in open-pit coal mining, this study selects Laiyegou Open-pit Mine in Ordos of Inner Mongolia as a case study. Based on the irregular geometric shape of the dumping site, the Mark-Bieniawski formula is optimized. Coupled with the physical and mechanical parameters of the geotechnical body, numerical simulations of the coal pillar and slope under the load conditions of the dumping site are conducted. Rhino software is used for three-dimensional modeling and grid division, and FLAC3D is employed for calculation and analysis based on displacement changes, plastic zone distribution, and slope sliding. The research results show that when the dumping site load is considered, the width of the supporting coal pillar is 2.9 m and the isolation coal pillar width is 8.88 m; without the dumping site load, the supporting coal pillar width is 2.8 m and the isolation coal pillar width is 8.29 m. The load from the dumping site exacerbates the deformation of the coal pillar. At a depth of 100 m during excavation, the roof subsidence reaches 7.3 mm, and the floor heave is 6.98 mm. At a depth of 150 m, the roof subsidence reaches 6.79 mm, and the floor heave is 7.63 mm. The slope displacement increases to 38.2 mm under the dumping site load, compared to 31.9 mm without the load. The load from the dumping site affects the stress and deformation of the coal pillar, especially during deep excavation, where the irregular load on the upper part causes significant deformation and stress concentration in the coal pillar, increasing the risk of instability. In areas with greater excavation depths, the load increases slope displacement, affecting the slope stability and increasing the risk of landslides. After the mining of end-slope overlying rock, a goaf is formed within the slope, leading to a dramatic increase in the plastic zone area, primarily due to tensile failure. The maximum shear strain increment is concentrated in the excavation roof area, forming a “settlement and progressive landslide” risk. In the stability analysis of this scheme, the safety factor of the slope is greater than 1.5, meeting the design specifications. In the process of end-slope mining with irregular dumping site loads, a reasonable plan should be considered to reduce the safety risks caused by coal pillar deformation and slope instability.

       

    /

    返回文章
    返回