大倾角煤层长壁综放工作面导水裂隙带演化规律研究

    Study on evolution law of water-conducting fracture zone in steeply inclined coal seam longwall fully-mechanized top-coal caving face

    • 摘要: 为研究大倾角长壁综放工作面导水裂隙带的发育高度,以王家山煤矿西二采区202综放工作面为研究对象,综合采用经验公式计算、物理相似模拟、数值模拟及现场实测等方法,对大倾角煤层导水裂隙带动态演化规律进行分析。结果表明,采空区垮落岩石充填程度呈倾斜中部 > 倾斜下部 > 倾斜上部的分布特征。倾斜下部因存在铰接结构,其采空区形成大范围空域;同时,因导水裂隙带高度已贯通顶板含水层,导致该区域易汇集形成积水区。随着工作面推进,覆岩持续失稳使空域受压减小,致使积水中形成承压水。在工作面倾斜方向上,大倾角长壁综放工作面导水裂隙带呈非对称梯形,初始开采时,裂隙带发育高度最高点位于工作面倾斜中上部;随着工作面持续推进,最高点逐渐向倾斜上部偏移,最终位于工作面倾斜上部,物理模拟与数值模拟导水裂隙带形态演化规律基本一致。根据经验公式计算得到的裂采比为10.6~16.2,物理相似材料模拟试验得到的裂采比为10.46,数值模拟得到的裂采比为16.63。现场实测数据表明,导水裂隙带垂高最终达到150.81 m,对应裂采比为16.67,该结果与经验公式计算上限及数值模拟结果较为吻合。

       

      Abstract: To study the development height of the water-conducting fracture zone (WCFZ) in the steeply inclined longwall fully-mechanized top-coal caving face, the 202 fully-mechanized caving face in the west No.2 mining area of Wangjiashan Coal Mine was taken as the research object, and comprehensive methods including empirical formula calculation, physical similarity simulation, numerical simulation and on-site actual measurement were adopted to analyze the dynamic evolution law of the water-conducting fractured zone in steeply inclined coal seams. The results show that the filling degree of caved rocks in the goaf presents a distribution characteristic of inclined middle part > inclined lower part > inclined upper part. Due to the existence of an articulated structure in the inclined lower part, a large-scale void space is formed in the goaf; meanwhile, since the height of the water-conducting fracture zone has penetrated the roof aquifer, this area is prone to water accumulation. With the advancement of the working face, the continuous instability of the overlying strata reduces the pressure on the void space, resulting in the formation of confined water in the accumulated water. In the inclined direction of the working face, the water-conducting fracture zone (WCFZ) of the steeply inclined longwall fully-mechanized top-coal caving face presents an asymmetric trapezoidal shape. During initial mining, the highest point of the development height of fracture zone is located in the upper-middle part of the working face along the incline; with the continuous advancement of the working face, this highest point gradually shifts to the upper part of the incline and finally stabilizes there. The evolutionary law of the WCFZ shape obtained by physical simulation is basically consistent with that of numerical simulation. The fracture-mining ratio calculated by empirical formula ranges from 10.6 to 16.2, the value obtained from physical similar material simulation is 10.46, and that from numerical simulation is 16.63. Field measured data indicate that the final vertical height of the water-conducting fracture zone reaches 150.81 m, corresponding to a fracture-mining ratio of 16.67. This result is in good agreement with the upper limit of the empirical formula calculation and the numerical simulation result.

       

    /

    返回文章
    返回