QIU Mei, SHI Long-qing, TENG Chao, XU Dong-jing, ZHANG Ji-peng, LIU Lei. Construction and Application of Structure Forecast of Quantitative Evaluation ModelJ. Safety in Coal Mines, 2013, 44(9): 207-210.
    Citation: QIU Mei, SHI Long-qing, TENG Chao, XU Dong-jing, ZHANG Ji-peng, LIU Lei. Construction and Application of Structure Forecast of Quantitative Evaluation ModelJ. Safety in Coal Mines, 2013, 44(9): 207-210.

    Construction and Application of Structure Forecast of Quantitative Evaluation Model

    • On the basis of extensive analysis of geological tectonic characteristics in Zhaoguan Mine Field, taking 5 usual parameters as indexes for the forecast of the geological structure, the quantitative forecast model in un-mining area is built by grey system modeling forecast, and then the evaluation parameter values are forecasted. On that basis, combining with the 5 usual parameters, the fault fractal value, one of assessment factors of fuzzy comprehensive judgment, is applied to the quantitative evaluation of the structure, and the geological structure complexity of un-mining area is quantitative evaluated.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return