ZHANG Yaohui. Rapid Filling Technology for Roof Falling Zone at Working Face with Large Mining HeightJ. Safety in Coal Mines, 2016, 47(8): 79-81,85.
    Citation: ZHANG Yaohui. Rapid Filling Technology for Roof Falling Zone at Working Face with Large Mining HeightJ. Safety in Coal Mines, 2016, 47(8): 79-81,85.

    Rapid Filling Technology for Roof Falling Zone at Working Face with Large Mining Height

    • According to the situations that the large mining height working face is easy to appear roof caving, and the roof falling zone will not only cause the empty-support of hydraulic support, but also easy cause gas accumulation, on the basis of the hazard analysis of caving area, a double liquid quick-setting filling material is developed according to the research of working performance of hydraulic support and the specific situation of roof caving of the working face; the material has the properties of rapid hardening, early strength, light weight and constant resistance. The material will achieve defluidization in 2 min after mixing, and the compressive strength can reach 3 MPa in one day. The fast filling technique is used for caving zone filling at working area, which ensures the normal mining at working face.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return