The Application of Flexible Fiber Network Support Technology in Removing Process
-
Abstract
Through the recovery process study of large inclined angle fully mechanized mining face in Qingshuiying coal mine which is under the condition of complicated geological structure,soft and broken seam roof,the results show that the flexible fiber network using in dismantling channel of 110202 working face reduces the labor intensity of workers and saves a lot of time,which effectively improves the construction efficiency of the finishing operations.
-
-